83

20mw Steam Turbine power plant

20mw Steam Turbine power plant  The QNP steam turbines` capacity mainly covers 200MW and below,Aiming at the global leading equipment manufacturing enterprise, our design and R&D standards are higher than GB standard and in the same league with European and American energy equipment manufacturers. Characteristics of QNP Turbine High speed, high efficiency, low energy consumption In-the-factory assembly and whole machine transportation make site installation easier, faster and more economical. Our state-of-the-art quality test center consists of a physics lab, a chemistry lab, a chemical analysis lab, a precision measurements lab and a metrology lab. The high speed dynamic balancing test machine can test rotors at speeds up to 15000 rpm. The Steam Turbine trial platform can do load tests and performance verification tests. Other instruments such as our German direct-reading spectrometer, tri-linear coordinate measuring instrument,…

A Video Interactive Platform For Global Opportunities

Copyrights © 2024 aliyangprinting.com All Rights.Reserved .